M4 TUNNEL

Commenced: June 2017
Completed: December 2017
Project Brief: The project is about 6.5km long (with 5.5km of the motorway in tunnel). The M4 East is the first underground section of WestConnex. It will connect to the widened M4 and extend it via twin motorway tunnels (New M4 Tunnels) from Homebush to Haberfield with three lanes in each direction. The M4 East will alleviate the frustrating delays and gridlock that motorists face daily when they come off the M4 and hit a standstill on Parramatta Road. ODK Construction was contracted for saw cutting, breaking and excavating storm water lines and installing pipes and pits.